This page consolidates extracts from the Modline 5 and Endurance manuals.


The E-5M5PK is approximately 30cm in length.


There is a discrepancy between the the handling of the Peak Hold reset connection of the Modline 5 (connect directly  to a relay or switch) and the Trigger input of the Endurance (connect relay or switch to Trigger F  and Ground(power) L.


Please contact for further information if your customer was using peak reset with Modline 5 and needs to use the trigger input of the Endurance to reset the peak hold.



Modline 5 connector:



Color coding:


Terminal Strip:



Endurance connector:


Endurance Connection Pin Coding: